搜索结果: 1-2 共查到“港口、海岸及近海工程 Preliminary”相关记录2条 . 查询时间(0.062 秒)
WIDENING RATE OF ESTUARINE REGULATION AND ITS PRELIMINARY CALCULATION IN THE TRAINING LINE OF NORTH DEEP-CHANNEL OF THE CH ANGJIANG RIVER ESTUARY
Widening Rate Changjiang River Estuary Estuarine Regulation
2013/7/22
Based on the morphological relationships of rivers and estuaries, a formula for calculating widening rate of training works in estuaries has been derived. The widening rate is related to dimensions of...
A PRELIMINARY STUDY ON THE MECHANISM OF SILTATION IN THE LEADING EDGE OF ALONGSHORE OPEN-TYPE PILED WHARF IN MUD BED ESTUARY
Alongshore open-type piled wharf Siltation slope of beach underwater Dredging harbor basin
2013/7/22
Alongshore pile wharf is widely used in most docks in China, but there occurs serious deposition when the wharf is built in the leading edge of the dock. Based on the analysis of field data, physical ...