搜索结果: 1-1 共查到“交通运输工程 optimal work start time”相关记录1条 . 查询时间(0.25 秒)
Determination of optimal work start time
optimal work start time stochastic dynamic simultaneous route/departure time equilibrium
2010/11/1
The question is: whether the system total travel cost and travel time are reduced by adjusting the work start time or not? This paper proposes the two-level model for answering the question; the upper...